use of choke in APFC panels..

Answer / k.prakashchandra

Probably to compensate for leading pf

Is This Answer Correct ?    0 Yes 0 No

use of choke in APFC panels..

Answer / jeya kumar

That is normally a inductor and it is used when the pf is leading..same as when adding capacitor to lagging pf.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Pleasd Tell Me..... In Generating Stations Why The Generation Of ELECTRICITY Is In 3 Phase Form?? OR In Generating Station Why We Generates The ELECTRICITY In The 3 Phase?? Why Not In The 4 Phase, 5 Phase Or 6 Phase Form??

3 Answers  


1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.

0 Answers   ABC,


IN 1000kva transformer where the oil and winding temperature sensors is connected

0 Answers   Cushman Wakefield,


wat s the electronic device used in the fan regulators recently?

2 Answers  


hw the cable size can be calculated when we have watss, volts, pf, i need the forula

2 Answers  






what are the disadvantages in GIS over AIS

0 Answers   Tata Steel Limited,


why do transformer make a sound

4 Answers  


what purpose of the percentage impendance in transformer

3 Answers  


assume we are put both df/dt and vector surge relay in same bus the df/dt relay setting is +5 hz an -5HZ. we want operat the vector surge relay before the df/dt how i calculate the setting of the vector surge relay.

1 Answers  


If we have 15000kw connected load in a factory than how much power demand sanction should be taken from electricity board. Pls provide complete calculation.

3 Answers  


2. What are the parameters of EHT sub-station?

1 Answers   APGenco, Blue Star, Enercon,


why buchholz relay is kept on inclined position and why it is cover??

1 Answers   GSECL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16636)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)