how pressure reduce through pressure control valve? suppose
we have to reduce 20 kg pressure to 10 kg pressure , then
what we do ? open the valve or close the valve , initially
it is 20 % is upon ( for ur knowledge ).
Answers were Sorted based on User's Feedback
My dear,
In control valve we ll compare the setpoint(operator interference value) and the actual pressure on the line.this deviation is given to the control valve.When the error is positive(means pressure is high),the C/V starts closing and when the error is negative(means pressure is low),the C/V opens and maintains the pressure.
One more thing,why u need to fix the low limit of control valve to open 20%.Depending on the deviation the controller controls the process pressure.
Finally,the controller tuning is must for this control.play with the gain and integral time and deadband to make steady process..
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / daxish_02
If pipe size is same before and after so this answer is correct..
basic fundamental behind the general formula that is
pressure=force/area......ok
here pipe size is fixed...ok
assume 20% valve open....than area of pipe cover after the valve is more so we get some pressure..
assume that valve open 40% so area of material flowing through valve increase so pressure decrease after the valve.....
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / g.s.arun
to open the byepass valve ,to reduce the pressure 20kg to 10 kg.
Is This Answer Correct ? | 1 Yes | 4 No |
If hart communicator provide 4-20ma source to any transmitter during the callibration?
Why upper weighing limit of electronics balance is 90% of the total weighing capacity?
how to calibrate pressure gauge(we can not able to fixed by pointer screw adjustment and pointer re fixing method)
temptrure me ketne frequiency hote hai
How does the "as-built" function benefit plant owner/operators?
HELLO FRIENDS plz tell me which are the PROTOCOLS we are using in PLC
how flame detectors sense the flame.
What is the procedure of calibration of Load cell?
hi,i am doing 3 year in electronic and instrumentation engineering. what type of aptitude questions will be asked in a core industries and how can i improve my skills in instrumentation?
how can calibrate vacume trasmitter by HART COMMUNICATOR ?
why most of the DP transmitters using maximum range as 0-2500mmwc?why not 1000 2000 3000 4000mmwc
basic connection and principle of axial shift sensor n differential sensors in tubine describes n draw......