Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What do u mean by Line voltage Monitor?Where it is used in a Power system?

Answers were Sorted based on User's Feedback



What do u mean by Line voltage Monitor?Where it is used in a Power system?..

Answer / raj kumar bhardwaj

Line voltage monitor is a device which monitor the line
voltage i.e. low voltage ,high voltagr ,phase reverse. High
voltage and low voltage can be set as per our requirement.
Line voltage monitor is used in AMF panels where DG starts
in auto mode depends upon the healthiness of line voltage.
generally LVM are used VMR ALVD

Is This Answer Correct ?    25 Yes 1 No

What do u mean by Line voltage Monitor?Where it is used in a Power system?..

Answer / srikanth_kalishetti@yahoo

Lvm means line voltage monitor.which is used in dg sets

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In ac which gas will be use?

2 Answers  


What is the difference between 11kv/110v & 33kv/110v ? If both 11 & 33KV give 110v then what is the diiference ?

1 Answers  


why ht motors are connected in star?

1 Answers  


what is bus PT ?

4 Answers  


why the generator will take 8 to 12 hours to start after it got interrupted due to technical problems in case of power plants.

1 Answers   NTPC,


what is the main purpose of line PT and bus PT?

11 Answers   L&T,


A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.

0 Answers  


How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.

0 Answers  


how many wires need to be bring to the motor if its star delta starter

5 Answers  


how we can classify the circuit braker???????

1 Answers  


Name the earthings?

3 Answers   HSL,


Why tripping not occur when the transmission breaks? Doesn't we provide earthfault protection for it?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)