why the generator will take 8 to 12 hours to start after it
got interrupted due to technical problems in case of power
plants.
Answer / venkatesan.j
In a thermal power plant the prime mover is a steam
turbine. In order to obtain the rated speed in a turbine it
takes about 4 to 6 ours depending upon the type and
capacity of the turbine.
| Is This Answer Correct ? | 3 Yes | 4 No |
if grounding is notdone at regular intervals for long distance transmission, will the load connected at distribution end receive voltage during negativehalf cycle of the sine wave?
We have 2 11kv/433v transformers for 2saperate acb for mv panels and 1 bus coupler acb. Suppose I’ll close bus coupler what will happen or it will be share the load. Please suggestion and any modification required.
How to calculate the Airconditioner capacity for a standard telecom BTS shelter?
why two contacts(in series) are using in closing circuit
After synchronization with grid how to maintain the power factor in lagging or in leading? if lead of lag what is the problem?
what happens if dc supply is given to the transformer?
What is encoder, how it function
how can a race around condition be eliminated using master slave flipflop?????
DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?
why are use star delta startor.
Why we use duplex coil and hook switch in telephone system?
which plant has high load factor
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)