Is it required to do earthing in 2nd shop if earthed
armoured cable is laid from 1st shop ?
No Answer is Posted For this Question
Be the First to Post Answer
sir please tel me how calucalte kwh if home taken load 30ams how maney kwh taken per day.and 3phase motor 5hp per hars how maney load teken and how mach kwh and forward me to electrical table for calicalte kwh and kvr and kvah
What is the difference between RCD & RCCB, Where it can be used
it says in neutral wire current flows under normal condition, but when we put tester it wont glow, why?
What are the transformer losses?
how can we convert 48V dc into 12 V dc? Any standard device for it??
How to decide the input and output circuit breaker for a 1600kva transformer.Is there any calculation is involved.
1.how to calculate energy units in our home at singe phase, 2.415V,63A wiring what will use thickness of wire
what is the function of LBB relay
what would happen if reactive power (kvar)is increased (more)or decreased (less)? how much exact reactive power should be maintained? and what should be done for that
what is main difference between live tank and dead tank current transformer?
What is a soft start?
What is resistance reading of earth copper rod with grid and without grid?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)