What is a Spool in terms of piping Industry?

Answers were Sorted based on User's Feedback



What is a Spool in terms of piping Industry?..

Answer / gopi ramesh

It is a small portion of pipeline which having two flange ends and basically used for fitting any external connection to the pipe stream.

Is This Answer Correct ?    10 Yes 2 No

What is a Spool in terms of piping Industry?..

Answer / arjun

when a particular pipe structure (need not to be straight,
may include tees elbows etc...) is repeated in a plant
piping , the repeating structure is shop_welded and
assembled at plant during erection. the same is known as spool.

Is This Answer Correct ?    4 Yes 1 No

Post New Answer

More Chemical Engineering Interview Questions

solution =2oolitre ,solute =Polyelectrolyte,Solution=water ,we have to prepare 1% solution.how much solute And Solvent?

0 Answers   Nixie Engineers Pvt Ltd,


what is the purpose of capacitor? and capacitor load means what? how does it connect?

0 Answers  


How much will be the increment for postal assistant yearly?

0 Answers  


wha is Adsorption column chromatography?

0 Answers  


what is the difference between PFR ,MFR and batch rector

1 Answers   BARC, CPCL,






ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?

1 Answers  


ENGINEERING ECONOMY - EXAMPLE 7.1 : In engineering economy, the future value of first year is FV = PV (1 + i). For second year it is FV = PV (1 + i) (1 + i). For third year it is FV = PV (1 + i) (1 + i)(1 + i) where FV = future value, PV = present value, i = interest rate per period, n = the number of compounding periods. By induction, what is the future value of $1000 for 5 years at the interest rate of 6 %?

1 Answers  


ENGINEERING PHYSICS - EXAMPLE 30.4 : (a) Time evolution in Heisenberg picture, according to Ehrenfest theorem is m (d / dt) < r > = < p >, where m = mass, r = position, p = momentum of a particle. If v = velocity, prove that m < v > = < p >. (b) Lande g-factor is given by Gj = Gl [ J (J + 1) - S (S + 1) + L (L + 1) ] / [ 2J (J + 1) ] + Gs [ J (J + 1) + S (S + 1) - L (L + 1) ] / [ 2J (J + 1) ]. If Gl = 1 and under approximation of Gs = 2, prove by calculation that Gj = (3/2) + [ S (S + 1) - L (L + 1) ] / [ 2J (J + 1) ].

1 Answers  


QUANTUM CHEMISTRY AND CHEMICAL ENGINEERING - EXAMPLE 31.7 : (a) The correct statement about both the average value of position (<x>) and momentum (<p>) of a 1-dimensional harmonic oscillator wavefunction is <x> = <p> = 1 - x. Find the value of x. (b) The probabilities of finding a particle around points A, B and C in the wavefunction y = f(x) are P(A), P(B) and P(C) respectively. Coordinates are A (3,5), B (4,-10) and C (6,7). Arrange P(A), P(B) and P(C) in term of a < b < c, when | y-coordinate | signifies the probability.

1 Answers  


what is the difference between the heat exchanger and cooling tower???????????

10 Answers   BARC, Essar,


What is the ignition temp. of Aluminum,Coper&Iron.

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.30 : A biochemical engineering sales contract adopts Cost Recovery Method in its company accounting. Gross profit is realised only when cash collections exceed the total cost of goods sold. Let Y = Original Cost Recovered, Z = Gross Profit Realised. Its property was sold at A = $500k with cost of B = $300k. Its engineering accountant receives cash of C = $240k in first year, D = $180k in second year and E in third year. (a) Find the values of Y and Z in : (i) first year; (ii) second year; (iii) third year. (b) What is the exact value of E if all cash has been fully received from sales?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16636)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)