generally the electrical equipments not to be operated at
leading power factor, why?
Answers were Sorted based on User's Feedback
Answer / sanjeev parekh
because generally all electrical equipments are inductive
loads.
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / srinivasa rao talasila
Our protection system will be setted at the certain
inductive current lag.If wer operated at leading PF our
relay system will not work perfectly and almost we by
passed the system from protection.
Is This Answer Correct ? | 0 Yes | 0 No |
what is ps impedance test
what is the reasons for blowing fuse
can we use heat gun instead of gas torch in 11kv termination kit. I mean can both sources provide enough amount of heat to ensure the uniform shrinkage of sleeve.
what is the tolerance of electrical frequency for India? it's .5% or 1%?
how to test and calculat the head and discharge in borewell compressor
what is the knee point voltage ? what is differtial rela? what is impedance and % of impedane? what is the postive phase sequance ? negative phase sequane ? and zero sequance impedance ? what is sortcircuit calculaion? why take calculation? define stabilty test ? why? what sentivity test? define merz protection ? what is the burden ? class 5p10, accracy, metering ct take knee point voltage test thet time what heppan why dont take knee point test to metering ct?
Why transmission line carryiny high voltage and low current?
3 Answers apspdcl, Universal Power Controls,
Why dose voltage rated at 11kva
1 Answers TK Chemical Complex,
Describe the colour rendering properties of i) tungsten filament lamps ii) tubular fluorescent lamp
sir i used 3 hp of motor for spraying pump, other home light and other home items which size of allminium pvc wire ix used
there is a # KVA Transformer of 11 KV/440V, in simple(not use formuia) how can you calculate it's HT & LT side current.
5 Answers Construction, wbsedcl,
To determine the Healthiness of Insulation we will be performing Dielectric tests i.e Insulation Resistance test, Partial Discharge test,Switching Impulse, Lightning impulse, Tan Delta test ...etc why we required to perform this many test, why cant we do only one test. for Transformer, CT's