Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

generally the electrical equipments not to be operated at
leading power factor, why?

Answer Posted / sanjeev parekh

because generally all electrical equipments are inductive
loads.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to determine motor size for a fan application?

2282


oltc of a transformer, how it works? and what are the equipment consist of describe briefly?

2025


In general bus riser follows the bus section in SWGR. What are impacts if bus section follows bus riser?

1548


how synchronous condenser is used in place of synchronous generator with out negotiating IEEE standards? Can i use 3 generators as synchronous generators and 2 generators as a synchronous condensers in an IEEE 14 bus system with out disturbing the standards?

2122


What is the theoretical reason for the size of a zig zag grounding transformer to be 1.732 times less than that of a wye-delta grounding transformer used for the same application?

2270


If 22 KV HT line, Current transformer is 25/5 then how to calculate multiplying factor.

1090


in basic 2 phase will short means tripping the power but spot welding 2 phase shorting but not tripping it will welded why.....(Q)

1947


what percent do you derate your copper wire when you change from copper buss to copper wire

1986


We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?

10443


what is vtg limit of earth and neutral at transformer side?

2030


Please send 110 kv sb station full single line drawing(sld)

2458


area control error

1731


What is the lower limit of break-down voltage of converter transformer.

1906


what is the control circuit for operating the clean room air shower

2256


what is the function of bearing in dc mchine" and where it is placed

2580