Answer / nimmakayala
compressive strength of strength of CONRETE
M denotes mix and
20 is 20N/mm² compressive strength after 28days of curing.
Is This Answer Correct ? | 30 Yes | 1 No |
Answer / guest
M means Mix
20 means compressive strength of the concrete
Is This Answer Correct ? | 25 Yes | 2 No |
Answer / vijay kumar.g
M -means mix propotoins like(cement,fine aggregate,coarse aggregate and admixtures)
20-means grade of concrete (1:1.5:3)
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vikas chauhan
M refers to MIX means symbol M denote MIX.
& number 20 denote the "CHARACTERISTIC COMPRESSIVE STRENGTH" in N/mm^2 or MPa after 28 days curing.
Means 20 N/mm^2 or 20 MPa (Mega Pascal)is the "characteristic compressive strength" of concrete after 28 days curing.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / varun
M20means
1bag cement (2tokri of cement)
1.5 sand (3 tokri of sand)
3 aggregate (6 tokri of bajri)
1:1.5:3
Is This Answer Correct ? | 1 Yes | 0 No |
What is density of crush sand and fine aggregate
what is rolling margin of steel
In a beam tension is always at the bottom but sometimes when we design using staad we get more number of rebars at the top compression zone Why?
What is mean by Engineers ?
what compressive strength of bricks?
a)tell density of steel , concrete, bricks , sand and aggregates.? b) what is knife test for wooden doors ? c) what is the meaning of term abrasion? what is tested in it? d) why pile foundation is provided in BCS?e) By total station what activities can be performed and on what principle it works? f) what is creep?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
during earth quake base shear force=a/w*g Comment?
How to calculate the wall thickness of building?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
logical reasoning