WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE
COMPANY?
No Answer is Posted For this Question
Be the First to Post Answer
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
how many kilograme per metre run of 6mm diameter steel bar
what is the projected employment outlook for this carrer?
WHAT IS IS CODE FOR USE TOR & TMT STEEL
the building construction what type of equipments are used in site and its purpose?
how we check the thickness and line of ceiling plaster.
What is the bearing capacity of black cotton soil, normal soil and rock?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
about higyway engineering
What do you mean by honeycomb in concrete?
1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)