Answer / mallikarjun b
when the amount of concrete is much lesser than the required amount it is called lean concrete
| Is This Answer Correct ? | 5 Yes | 20 No |
Answer / sam
when the amount of concrete is much lesser than the req
amt..its called lean conc
| Is This Answer Correct ? | 16 Yes | 52 No |
You have casted a column above your footing, and you found out it is off its location by 5cm. What would you Do?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
What is the difference between EPC,DBOOT and BOOT.
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
How cracks in concrete can be avoided?
Cost control in civil construction as well as Quality control
How do you determine or evaluate success?
how to calculate testing date
Formula for calculating the weight of ismc 75
plz.show development and anchorage length in simple diagram.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)