How to calculate & connection of 900KVA generator
2 sets & load(1500A)?
How to choose cable size and ACB size for this load &
generator?
please explain me detail.
Regards,
Mr.Han
Answers were Sorted based on User's Feedback
Answer / subra
ACB ------- 2500A
cable size = 630sqmm X two per phase one 630 sq mm for N total seven 630sqmm cable need
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / bala_vlsi
U Can select 1600 A breaker for incoming of D.G source
and u can refere cable calouge and select the suitable
cable for 1500A THAT TIME U SHOULD CONSIDER VOTAGE DROP
CALCULATION FOR THE SELECTED CABLE .
| Is This Answer Correct ? | 5 Yes | 3 No |
Hello, I am just preparing my self for a university interview and struck on the 11kv ring main unit system network. I just know that ring main unit has total three breakers, fuses and use to supply a power to any load/ building without any interrupt. But i am not be able to visualize the connections, either Ring main unit getting power from two different power sources? or there is always one feeder in complete ring circuit??? I would be highly thanks full of you help me.
why moisture formation found in XLPE Armoured cable outer sheath
Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KVA T/F in our site, can you help me that how many maintenance tests can be conducted and what are the procedures included for the tests can you share yours answers and also give any web address to get more information on this
how a synchronous motor is used as a resistor,capacitor and an inductor?
Which type of power plant is more easier to produce electrical power at economical condition?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
How to work meggar?
what is the difference between inductive load and capacitive load?give me some examples in general
how to commissioning the genset with amf panel?
Why 36 KV LA is used in 33 KV Line and 9 KV LA is Used in 11 KV Line
1 Answers APTransco, Bhel, Wipro,
WHY IL=IPH IN STAR AND WHY IPH=IL/1.732 IN DELTA? WHAT IS REASON BEHIND IT?
why pull the single core cable?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)