How to calculate WIP in PS for all wbs pertaining to that
particular project? Any specific T code in ECC 6.0?
Answers were Sorted based on User's Feedback
Answer / deepa
KKA2 for calculating result Analysis;
KKAJ - for calculating WIP
Is This Answer Correct ? | 16 Yes | 2 No |
Answer / m t haque
KKA2 and KKAJ both do the same thing (RA and WIP calculation terms are used interchangeably) only difference is KKA2 is for individual processing while KKAJ if for collective procesing
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / p.chaithanyavikram
HI All
Through T-code KKA2, Result Analysis we have to calculate the WIP (Work In Progress)
Is This Answer Correct ? | 0 Yes | 0 No |
What are the important processes for project integration management?
What is effort variance?
List different types of time profile
What is the primary purpose of procurement management plan?
How do you determine the communication needs of stakeholders?
What is Project Management?
5 Answers A1 Technology, Aktiv, T systems,
Do you think professionalism and integrity are essential qualities of a pm?
Where do we define time profiles? What is evaluation period?
What does scope management involve?
What is sap grc fraud management?
What is project type?
how would you lock the wbs elements? that the user can not release the pr