Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many nos of hacking over concrete surface required for
1 sq m area

Answer Posted / shabarish

60 to 80 indents per sq.ft

Is This Answer Correct ?    4 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

rate analysis for cement pointing 1:4 , for 100 sq m

4165


sir, whitch is the best book (writer name) for prepration of gate....

1661


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

975


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2060


What are the applications of the modulus of elasticity?

1090


Define What are the uses of Groynes?

1181


What difference comes in constructing of house and a housing complex like society

1885


how to convert cement, sand aggregate quantity from M3 to kg with full description?

2097


it is possiblee to produce concrete with out cracks...

1897


what is column foundation

2379


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

2539


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1545


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2130


How to calculate material and labor required for 100 m2 plaster?

1830


how can we construct building without foundation providing only grade beam at ground level

1687