Answer / shuvro
We konw, Unit weight of cement = 1440 kg/cum
i.e. 1440/3.28^3 kg/cft
= 40.80 kg/cft
1 bag cement = 50 kg,
Then, 1 bag of cement = 50/40.8 = 1.23 cft
1 ag of cement = 1.23 cft (apprx.)
But, the most common practice of 1 bag cement = 1.25 cft
Is This Answer Correct ? | 181 Yes | 12 No |
Answer / madhu
We know that, 1 cum of volume takes 1440 kg of cement.
Likewise, For 1 cft of volume how much quantity of cement takes.
Unit conversion, 1 cum = 35.3147 cft or 35.32 cft.
w.r.t 1440 kg of cement = 35.32 cft.
therefore, for 50 kg of cement =1.226 cft or 1.23 cft
(1 bag of cement = 50 kg)
Is This Answer Correct ? | 44 Yes | 9 No |
Answer / sjtbehera
1 bag cement = .0347 cumt
so .0347/35.32 = 1.22cuft
Is This Answer Correct ? | 46 Yes | 19 No |
Answer / vignesh
1 cum = 1440 kg
1 cum = 35.315 cuft
» 1440kg = 35.315 cuft
1 kg = (35.315/1440) cuft
1 kg = 0.0245 cuft
» 50kg= 50 * 0.0245
50kg = 1.2265 cuft = 1 bag
( 1 cuft = 40.77 kg)
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / vignu
1 bag cement =50 kg
1m³ of cement=1440kg
1 bag of cement in m³ = 50/1440
= 0.0347m³
1 bag of cement in cft = 0.0347 x 35.32
= 1.226 cft
~ 1.23 cft
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / prabal varshney
1 bag cement in
0.03472 m3
1 bag density is 1440 m3
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / silpa
1 Bag cement-50 kg,
1440/50=28.8 m3=28.8*35.32=1017.062cft
1bag of cement=1017.062cft
Is This Answer Correct ? | 13 Yes | 177 No |
how many bags of cement are needed to make a cement mortar of 1:3
5 Answers ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,
what is dead wall?
Minimum sizes of beam and coloumn
briefly describe your ideal job?
numerical example of solving water cement ratio
how to calculate the strength of rebound hammer test reading in building construction ?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
how to do connection between steel beam (I-Section) with R.C.C column??
Can we provide lapping of R/f steel for plinth beam in support portion(At column)?
What do you mean by the word 'shear'?
What are the causes of failure of foundations and remedial measures?
CALCULATE QUANTITY OF RCC COLUMN