Answer Posted / nimmakayala
Bad question - please remove
| Is This Answer Correct ? | 37 Yes | 5 No |
Post New Answer View All Answers
How do you change a dimension value in solidsworks?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
what is pile and deam foundation
Stringer How many cm goes to landind
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Define What is diversion tunnel in a dam?
how meny typs of renging rod?
Explain moment of inertia and its importance.
What is Critical path in Ms-Project ?
what is the difference b/w full length and cutting length?
what is the most suitable foundation when construct a bird watching tower in a marshy land
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
60-70 grade of Bitumen is VG-30 ?