Answer Posted / basheer
please multiple sft with length or width.
Area =sft, volume=cft.
Area =b×d,
volume =l×b×d.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How many mortar required for Brickwork of 1 Cu.m works??
What is the strength of cement?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
What is braced excavation all about?
What is zoning permit?
Explain the importance of moment of inertia?
What is aggregate?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
What is difference between combin footing & rapt footing
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
how much of the strength comes from post-production curing
how to caliculate required amount of cement and sand required for 1cu.m.