in varient configuration i have done all the configuration,
created class,char,and dependencies,and assignments,then i
created condition record va00 and pr00, but in sales order i
am not getting the price result only i m getting material
price..give me what are conf, i m missing....thanks in adavance
Answers were Sorted based on User's Feedback
Answer / prasanna
i will tell u the process try it once
tell me the feedback.
Example: Engine:150cc,220cc,
Colour: red,black.
Configuable material is Pulsar.
1.create the Char.of engine(T-Code CT04)
2.Create the Char.of Colour(T-Code CT04)
3.Create the Class.
4.Create the price of the Char.(T-code CT04)
in that put the Char.of Engine as well as
Char.of Colour.
5.Create the Configurable material(EX:Pulsar,MM01)
6.Put the Class in the Material Master
under the Classification Tab.
7.go to the change mode of char. of engine
and select one by one each engine
like 150cc and 220cc for maintaing the
Dependency.(
8. similar to maintain the Char.of Colour.
9.Maintain the condition records for variants
by using the condition type VA00(T-Code VK11)
10.Maintain the condition records for
Configuable Material by using the
condition type PR00(T-Code VK11).
11.Raise a sales order and select
Any Engine and Colour u can get
the price of the material as well as variant.
please check and tell me the feedback
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chirag
What you need to do is first create a set of variant keys .
let us supposed you have two chars A and B.
Char A has value 1 and 2 char B has value 3 and 4 .
Now what you need to do is . Maintain a variant table with
char A and Char B and the Variant key as the char . Then
Put in the combinations ie . If Char A has value 1 and Char
B has value 3 then variant Key should be VK1 and so on .
Then in the pricing condition Put the variant key and
corresponding price . ie VK1 and say 15 $
so next time when you configure based on your char values
the corresponding pricing key will be picked and the price
will be determined
Is This Answer Correct ? | 0 Yes | 0 No |
Is it possible to automate output processing? The answer should be yes but how??
how the internal process is going on in automatic credit check
hi freinds i have a problem once i do the cin work in sap 4.7ee? i am unable to copy G/L accounts from 000 client to 800 client i copied CAIN chart of account but i am ubale to copy th G/L accounts to company code. can u please help for that?
what is backorder processing?
In what condition route is determined?
what is difference between individual and collective requirement
What is sales office? How do you set up sales office?
Basic elements of condition technique?
CAN WE DELETE THE CUSTOMER?IT IS POSSIBLE THANKS IN ADVANCE
Can anyone explain an example of a real time ticket?
How do we control credit check in pricing?
Even after Rebate agreement validity periods finish and the status is showing D completed still acuurals are calculating the accurals..for eg validity periods are finished at 2011 when we create billing document is creating in 2012 still accurals are calculating, where might be went wrong