qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
No Answer is Posted For this Question
Be the First to Post Answer
whike making bbs we deduct 2d for every bend in bar but theoretically we cant subtract 2d for every bend and for every dia of bar , so plz tell me the exact deduction for bends for different dia of bars and for different angles ??
what is preposition of M-5 grade
3 Answers Montag Infrastructure,
Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
what is mean by Face bar using in coloums?
how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
16 Answers ARS, College School Exams Tests, Gulf Construction, HRL, mWorkspace, NCC, URC Construction,
how to convert kg/m3 to cu ft
Method of findingthe dry ingredient quantity of 1 m3 concrete.
25 Answers Annai Infra Developers, GKC Projects Limited GKCPL, IRE, L&T, Mahle Filter Systems, NCC, PNRD, Rama, RCC, Shivani Agriculture, Sobha Developers, Suraj Constructions, TCL,
What is the Null Point of chimney in Power Plant
What is bylayer?
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
productivity of steel fitter per day
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)