Answer / naresh kumar dhal
making capacity=2.55*symmetrical breaking capacity
Always ckt breakers are rated in its symmetrical breaking
capacity.It is the rms value of fault current that a ckt
breaker can handle for short duration of time,which is
called short time rating.
If breaker is rated 10 mva,then its symmetrical breaking
capacity is 10mva.i.e root3*v*I*10-6=10mva,from this u
calculate current.Which is the symmetrical breaking current
| Is This Answer Correct ? | 9 Yes | 2 No |
making capacity of a circuit breaker means when you switch
on the breaker the breaker can operate safely or withstand
upto the stated amount.
The same applys to breaking capacity of a breaker which
means when it switches off it can withstand up to the stated
amount at the time of offing. The unit used is usually KVA
or MVA.
Some breakers can have a high breaking capacity but a low
making capacity. This means when switching on it should not
be loaded but can be switched OFF with a high load.
| Is This Answer Correct ? | 12 Yes | 7 No |
Answer / vs
ans 1 is absolutely wrong .ans -2 is right .making capacity
is always higher than breaking capacity .
| Is This Answer Correct ? | 4 Yes | 0 No |
what are the sample questions asking to the test cunducting for electrical superwising lisence test?
Whai isPCC and MCC Difference?
how do we calculate length of starting time and repeated starting of a direct online starter?
The power showed in the name plate of the motor is input power or output power?? The power showed in the name plate is 18.5kw measured current is 34.5 amps. location is india. can i calculate the efficiency of the motor using this data??
whats the diff b/w mpcb and mcb?weather it trips on single phasing or not.
9 Answers Electra Power, Essar,
what type of current supply is given to house holds?
Transfer of electric power from primary to secondary in a transformer takes place A electrically B magnetically C electro-magnetically D conductively
what is the saturation point of crgo lamination.
A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42
If we want to change a contactor of faulty one what are the conditions want to fullfil
Draw the DOL starter and star delta starter drawing?
In A.C systems, fuse is placed in phase-in order to disconnect the circuit during faulty condition. But, what is the reason for putting "LINK" in neutral istead of connecting through (same) wire.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)