Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is Energy based relay coordination & time based relay
co-ordination? In which type of distribution arrangement
these methods are applicable?



What is Energy based relay coordination & time based relay co-ordination? In which type of dis..

Answer / omar aziz

Every electrical equipment installed in a power system has
an I2t rating. Eg(20kA for 1sec) This indicates the maximum
permissible energy that the equipment can withstand before
blowing into bits. Protection co ordination must ensure
that this damagiong curve is always protected by the
protection system. This is Energy based coordination.

Time based coordinaation is when no energy basis are
required but time selection is picked for personnel safety
reasons and not equipment damage reasons

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What are the rating wise protections required for Generators from 600KVA to 2000KVA

3 Answers  


1.Why hydrogen used for cooling in generators 2.Why electrical equipment protected by ground 3.Why earthing for transmission line 4.What is rms value of half wave rectified square wave. If Rms value of actual wave 2amps.

1 Answers   Power Grid,


Is there is any hazard to insulation of 3hp motor 5 KV megger is used for it?

1 Answers  


Why there is not any reactive power in DC although it causes magnetic field.

7 Answers  


WE are using a 63A MCCB(SIEMENS MAKE) for one of the feeder in LV substation panel.It is supplying to a lighting & power socket DB.Settings in the MCCB is Ir = 63 * 1 , Isd = 8 times of Ir , tsd = 0.5 sec( I2 t off). Sometimes this MCCB is tripping .But no trip in DB MCB. Can anybody tell me reason ? From where i can know about the MCCB settings?

5 Answers  


What is the speed of 3 phase IM(Induction motor) at no load? How will the Motor meet the increased load(Explain through fundamental)?

2 Answers  


What does Bode plot tell you?

0 Answers   Ericsson,


What is the difference between MCCB, ACB & VCB

7 Answers  


Define conversion efficiency of a power amplifier.

0 Answers  


why ferranti efect occurs on no load only?

3 Answers  


why so maney smaller size capacitor use instead of single Big size capacitor in apfc panel

1 Answers  


WHAT IS THE DIFFERANCE BETWEEN IP54 AND IP55

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)