Commissioning a distribution transformer knowing all its
rating, Transformation ratio, Vector group, Phase sequence
is a skilled Job. You will need the information of complete
system like where the distribution transformer you are
talking about comes.

Information needed will be,

1. Single Line Diagram of the complete circuit (So as to
clearly understand the vector group/ rating of the
transformer to be installed, if there are many distribution
transformers to be installed in a locality).
2. Transformer foundation drawings and the drawings of
Bolts where the transformer will be bolted.
3. Whether to be installed on ground/ On pole
4. Whether oilfilled/ Drytype.
5. If oil filled provision of soakpit and clearances from
firewall.
6. If conservator tank and radiators are there the clearances
7. Provision for grounding.
8. All drawings of transformers from all angles.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why we are caling 440 volt 3 phase supply instead of 660 volt 3 phase supply? because each phase as a voltage of 220 volt. if anybody know the answer for my question please send it to my mail id. thank you.

3 Answers   College School Exams Tests, Jindal Steel and Power, JIOL, NEC,


What is partial discharge in power cable?

1 Answers  


Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?

0 Answers  


What is the minimum underground tank size capacity considered for firefighting purpose?

0 Answers  


how to define tell me about self

0 Answers   Bhel,






if the transformer at full load have a iron loss =900w and copper loss = 1600w . what percent of the load will the transformer has a maximum efficiency?

3 Answers  


1.What is the maximum transmission voltage in india & where it is located? 2.more information about indian power scenario.

4 Answers  


What safety followup during kWh meter isolation

0 Answers  


What are safety device in vcb and acb?

0 Answers   IOCL, L Usine Fashion,


what is phase and neutral.

2 Answers   Birla,


can anybody send me syllabus of rrb section engg (electrical). and also send previous question pepar...

0 Answers   GKB,


What is power distribution criteria for converting single phase unbalanced residential load to 3 phase star connected balance system. Does total KW converted to 3 Phase. Means Divided by root 3.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)