What is Energy based relay coordination & time based relay
co-ordination? In which type of distribution arrangement
these methods are applicable?
Answer Posted / omar aziz
Every electrical equipment installed in a power system has
an I2t rating. Eg(20kA for 1sec) This indicates the maximum
permissible energy that the equipment can withstand before
blowing into bits. Protection co ordination must ensure
that this damagiong curve is always protected by the
protection system. This is Energy based coordination.
Time based coordinaation is when no energy basis are
required but time selection is picked for personnel safety
reasons and not equipment damage reasons
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
WHY NUTRAL GROUND SYSTEM USED IN 33KV SYSTEM
what is the concept of directional power?
What is the rating factor for copper cable ( Specific value according to the type of laying ) & the voltage drop?
What is Phase to Phase clearance for 800V System Operating Voltage as per IEC61439
how to do the ductor test?
Who are the manufactures those manufacturing 3Cx2.5sqmm FRLS cables. I heard about FRLS technology adopted only in wires useful for wirings
I would like to know that the fault curretn at base load and at 10% generation will be same? Fault level of BUS remain same with different generation?
take 100kva DTR( delta/wye ), what ll happen if we connect 11kv to LT side instead of connecting to HT side? will the DTR behave as a step up transformer or something else????
WHAT CAUSED THRESHOLD VOLTAGE TO EXIST?
What is meaning of out of phase (making & breaking) capacity And how to calculate
WHY IS THE EARTH FAULT CURRENT ALWAYS LESS THAN THE NORMAL CURRENT??
hi friends if you have any 400KV Substation Erection and installations Drgs please send to me.My email id:kandi.suresh441@gmail.com
How much depth n width required for laying of 1X70 Sqmm Cable in Desert???
What is an alternator impedance value?
What is sink and source?