If you don’t have coal, salt and copper, then how would you
earth your connection temporarily at a campus site?
Answers were Sorted based on User's Feedback
Answer / udayak25
Then u can (1)connect earthing wire to the GI water
pipeline.
(2)or connect to building structural bars.
for these any how check once bcoz there may be
disconnection in bars or pipe.
(3) one more is take a bar of MS & burry it around 1ft below
GL, and
connect earth wire but be sure the soil should wet all time.
Is This Answer Correct ? | 4 Yes | 0 No |
What is OLTC in transformers and what is its function?
HOW BETTER VOLTAGE REGULATION IS OBTAINED BY HIGH VOLTAGE TRANSMISSION....?
WHY WE GENERATE 3 PHASE POWER ONLY AND NOT 4 OR 5 OR 6 PHASE??? PLS REPLY.
What is the d/f between DOL & star delta starter & automatic star delta starter?
23 Answers ACC, Dalkia, Engineering, Indeco, NINL, Novotel, RMH Control Systems, Wipro,
i have applied for the post of RRB section engineering chennai board please send me previou papers and solved answer. my mail id jagarapusrinivas@gmail.com
Why we are going for converter transformers for DC drives application instead of distribution transformer?
Define cuttoff frequency?
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
what is effect of brush shift in machine?
IF ANY MATERIAL AVAILABLE IN MARKET FOR MOTOR PROTECTION INSTEAD OF OLR & CONTACTOR ?
What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor
What is the acessaries distribution transformer ?