Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If you don’t have coal, salt and copper, then how would you
earth your connection temporarily at a campus site?

Answer Posted / udayak25

Then u can (1)connect earthing wire to the GI water
pipeline.
(2)or connect to building structural bars.
for these any how check once bcoz there may be
disconnection in bars or pipe.
(3) one more is take a bar of MS & burry it around 1ft below
GL, and
connect earth wire but be sure the soil should wet all time.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7771


if negative of DC supply used and positive is grounded through EGB, and if ELCB used in the system then is it sense the positive volatge and get tripped is it possible?

1953


What type of a DC motor would you use for a lift?

1125


what is the difference between switch yard to residential area.and how much required it.

1824


Explain the process of commutation in a dc machine.

1103


What is an ac motor?

1334


Why the field rheostat is adjusted such that the voltmeter reads 380V

2349


What is the typical enclosure type used for Indoor switchgear / Outdoor switchgear Units? - In Onshore / offshore Units?

1050


Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend

2166


how braking & making capacity of circuit breaker is calculated?

2047


why all the feeders are designed in a particular manner ... is there any reason for that???

2003


why the field winding in dc motor is not short circuited eventhough dc supply is applied across the winding

1902


What is the comparison between 30mA DP RCCB and 100mA DP RCCB and can replace it against 63A MCB

1652


where does 22kv line starts

3151


Ac generato how produce power I need for camplet defination

1829