in the construction of building,we are use formula for
laping? such that how many formulae we use? which are them?
Answer Posted / manoj dagar
To get lap
1 we use ( 50 x
dia ) formula .
2 caplar formula.
3 according to
Drawing
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What are new methods /technologies of pothole patching?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
how much percent are used 20mm,10mm?
what is mean by reestimation?
How many cum of 9.5mm stone in 1 ton ?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
explain five benefits of using standard terminology in the measurement process?
Why steel rods are produced only in even dimensions?
What is the difference between built area and super built up area?
What is bmc stands for in bmc software?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How is the strength of cement measured?