Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


can i use 1 sq mm insted of 1.5 sqmm cable

cable length 600 mts under ground laying

Cable carrying 24 vdc

4-20ma current

Answers were Sorted based on User's Feedback



can i use 1 sq mm insted of 1.5 sqmm cable cable length 600 mts under ground laying Cable carr..

Answer / deepak

Yes you can..

Is This Answer Correct ?    10 Yes 1 No

can i use 1 sq mm insted of 1.5 sqmm cable cable length 600 mts under ground laying Cable carr..

Answer / tc abdu salam

Yes You can use 1 sqmm cable. It is more than enough for
carrying 4-20 MA for 600 mts. The insulation quality is the
most important in signal cable.

Is This Answer Correct ?    4 Yes 2 No

Post New Answer

More Instrumentation Interview Questions

what is the calibration procedure for transweigh make weigh feeder?

0 Answers   Anjani Cements,


Linear amplifier.

0 Answers   CCIE,


in transmiters(rose mount) how to check output 4-20ma ? and input 24v? i need exact explanation?

2 Answers   Adhunik,


An equipment is certified for EEX, IA, IIC, T6, what do you under stand by this.

3 Answers   ADMA OPCO,


what is the input of ph sensor and meter during the calibration time and what is the output?

1 Answers   Sabic,


while am calibrating Drager polytron 2IR flame gas detector occured non zero status.how can i get zero status?

0 Answers   Gasco,


Could you explain to me the enraf (servo gauge) mechanism. How it works ? and how it is working on archimedes theory while it's not immersed into the surface? and how can we calibrate it ? Thanx

1 Answers  


POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?

0 Answers  


why are set -10vdc in bently neveda vibration system.

4 Answers  


The company where I am working, their is rosemount 5400 series radar type level transmitter, it is meant to show level of filled tank, but along with the level it is showing temperature also, so my question is how a onon-contact type radar type level transmitter can show temperature even if it does not have any contact with the fluid?

0 Answers   Process Control Technologies,


What is Cavitation?

2 Answers   Gujarat Borosil,


Good evening all I need a small favour regarding reliance paper i wanna probable sample papers(e&i) of reliance. if any of u have any idea about dis then plz mail me back.i belongs to electronics and instrumentation engg.so i need e&i papers. thanking u....

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)