Answer / suhas poria
RCC NP3 pipe means Non Pressure Hume pipe made with
reinforcement cement concrete. It stands in class 3. It is
medium duty pipe. it is used for irigation and culvert with
medium traffic density.Other classification is NP1
(Concrete non pressure pipe with no reinforcement), NP2 (
It is light duty), NP4 (it is heavy duty.You can refer
IS:458-1988 for further details information.
| Is This Answer Correct ? | 129 Yes | 6 No |
Answer / dipesh shah
Reinforced cement concrete Non pressure of class 3 pipe
(high strength pipe) it is used where the huge amt of water
is flow through gravity.
| Is This Answer Correct ? | 47 Yes | 5 No |
Answer / nitesh mangal
There are mainly two different varieties of Reinforced
cement Pipes. They are classified as Class NP2 and Class
NP3 depending on the type of load pressure to withstand.
| Is This Answer Correct ? | 23 Yes | 9 No |
Answer / b.yamini
RCCNP3 : RIENFORCED CONCRETE CEMENT AND NP3 IS ACC TO ISI
CLASSIFICATION IT IS ONE OF THE CLASS IT HAS NP2 ,NP3,NP4.
AND RCC NP3 IS ONE
| Is This Answer Correct ? | 20 Yes | 14 No |
Answer / vinod p s
RCC NP3 pipe means Non Pressure Hume pipe made with
reinforcement cement concrete. It stands in class 3. It is
medium duty pipe. it is used for irigation and culvert with
medium traffic density
| Is This Answer Correct ? | 9 Yes | 3 No |
Answer / prashanth
Non pressure-3
The dia of steel cage will be in higher size as compare NP2.
| Is This Answer Correct ? | 7 Yes | 3 No |
there are lot of pipes that is sewer pipes.
this is the grade of the pipe in compressive strength.
these are reinforced cement concrete pipes with
compressive strength LOW, MEDIUM and HIGH.
| Is This Answer Correct ? | 12 Yes | 12 No |
parts of stair-case?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
WHAT IS THE SPLICE LENGTH WHEN WELD IN REINFORCEMENT STEEL
how much cost of single coat 20mm thick plastering per sqre meter
density of crush sand & crush stone or grit powder
differance bet QA & Qc
what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?
M30,M35,M40,M45 how much ratio
where you provide overlap on column?
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
6 Answers Nagarjuna Construction, NCC, Ramky,
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)