Answer Posted / prashanth
Non pressure-3
The dia of steel cage will be in higher size as compare NP2.
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
what is tension footing?
What are the responsibilities of a site manager?
What is the snap size in civil and how can we create it?
How many mortar required for Brickwork of 1 Cu.m works??
length where bent up is made in slab of bridge from one end
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is m30 in concrete tiles
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is fineness modulus ? and its sieve # ?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
why does the most of civil engg is not intersted to going for teaching field?
What is Architect-Prepared Contract?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how many BSCs can i connect to the HUAWEI MSC
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?