11 kv metering is done in my factory.Meter show PF 1.000
but kvarh lag&lead show 24&94 respectively & Avg.PF
is .956 .? is what i do for inproove my PF to 1.000
Answers were Sorted based on User's Feedback
Answer / vinit patil
Your Meter reads Power factor at load center. In your case
load center might be far away from your tariff meter. Since
your APFC meter shows PF 1.00 but at your tariff meter on
11 KV side p.f still lagging. This happens because of
transformer inductance. Add 10 % KVAR of transformer
capacity directly in ON position. Your problem will go out.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / prasad
If your metering cubicle is showing PF as unity then what
is the problem?
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / arvind
it is very difficult to achive 1 power factor because it
depends on the load. as u said it is 0.956, then it is good
that power factor is almost to 1.
Is This Answer Correct ? | 0 Yes | 4 No |
What is the capacitance values of 132,220,400 & 765 kV current transformer
why are laminations used in constructing the field core?
Please explain, how to test vector group of tranformer(Delta y1) . Thank
how to calculate busbar size? ex:11000kva main what is the busbar size ?and how to select the correct one
Is vtg is controlled by the resistor? if else how much?
what is meant by class 1 E in electrical power supply?
why we condut tan delta test i want brief explain?
why open circuit test is conducted on hv side and short circuit test is conducted on lv side of a transformer ?what is the reason for it ?
what are the different kind of cables used for transmissions?
What is C curve and D curve of MCB?
what is the principle of operation of synchronous motor and generator? explain in detail.
How you will determine the volume of oil in a particular Distribution transformer.