11 kv metering is done in my factory.Meter show PF 1.000
but kvarh lag&lead show 24&94 respectively & Avg.PF
is .956 .? is what i do for inproove my PF to 1.000
Answers were Sorted based on User's Feedback
Answer / vinit patil
Your Meter reads Power factor at load center. In your case
load center might be far away from your tariff meter. Since
your APFC meter shows PF 1.00 but at your tariff meter on
11 KV side p.f still lagging. This happens because of
transformer inductance. Add 10 % KVAR of transformer
capacity directly in ON position. Your problem will go out.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / prasad
If your metering cubicle is showing PF as unity then what
is the problem?
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / arvind
it is very difficult to achive 1 power factor because it
depends on the load. as u said it is 0.956, then it is good
that power factor is almost to 1.
| Is This Answer Correct ? | 0 Yes | 4 No |
Explain about technical and non technical losses in distribution system?
Use of electrical theorems (thevenin's,norton's,millmen's,superposition,reciprocity, Maximum Power Transfer theorem,Compensation Theorem) IN REAL LIFE???(IF YOU KNOW EXACT OR CORRECT ANSWER).
2 Answers College School Exams Tests, L&T, PESIT, Wipro,
long form of CT
3 Answers MSETCL Maharashtra State Electricity Transmission Co Ltd,
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
what is protections used for 6.6kv ht motor
whydoes the p.f of diesel generator always be 0.8 explain how will you determine the shortcircuit capacity of network
What is the actual meaning of thermal power efficiency ?
How to design harmonic filter at the project stage without nowing the harmonics levels
why we have to do tan delta test of the transformer oil???
Do power transformers have an Automatic Voltage Regulator (AVR) just like the alternator/generator in a power system?
what is the function of open delta System?
How could I get a certificate of competency as Electrical Supervisor? I have completed By BTech in Electrical this year(2012) for VJTI Mumbai Maharashtra. Is it compulsory to be produced while joining?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)