Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is 43 & 53 in cement

Answer Posted / emdadul haque

The number (43&53) to the specified Characteristic
compressive strength of 150mm size cube at 28 days,
expressed in N/sqmm.

Is This Answer Correct ?    7 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When column of building is abutting the boundary line,then suitable footing advised is

2578


What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2574


what's the formula for calculate pcc for matt(45mm aggregate)?

2746


How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?

2041


In reclamation works what are the importance of geotextiles and sand?

1154


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

2161


What is rate of concrete surface rendering work per sqm

2015


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2166


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2436


What is the Null Point of chimney in Power Plant

3752


What year was the keystone power plant in Indiana County constructed?

1164


How to determine spacing of bars in slabs or beams

2475


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3049


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

2122


How much cement and sand required for 9"brick wall per square metre

2926