what is the implemention project in sap?
No Answer is Posted For this Question
Be the First to Post Answer
Account assignment category means. where do we come acros it. where we specify it.
SAP DEPRECIATION RUN ERROR: I have a problem with depreciation posting. I have searched the forum but did not find any answer. Net book value of $ 559,350 as on April 2012 was fully depreciated by 31 Mar 2017. Additions between April 2012 and March 2017 were correctly depreciated. However, additions from 01 Apr 2017 were fully depreciated when depreciation program was executed. For example, asset acquisition on 01 May 2017 $ 2400 was fully depreciated ($ 2400) which is not correct. It should be $ 2000*20%/12*11 = $ 440. Subsequently, in Jan 2018, on the acquisition of $ 207, the system has posted a positive depreciation of $ 47,469 on the base value of $ 1,640,423.72!!! More surprisingly, acquisition after that is correctly depreciated. For example, acquisition on Jan of $ 3,488.94 was correctly depreciated by $ 174.45 (3488.94*20%/12*3 months). Here are the details of the configuration of depreciation: · Depreciation method SLM · Base method 0014 · Useful life: 5 years (20% depreciation). · Period control 01/01/01/01 · Depreciation after the end of planned life – the box is “checked”. · There is only ordinary depreciation. · “Only negative values and zero allowed” checked in Rule for positive/negative sign for ordinary depreciation in Depreciation Area. · Fiscal year: April to March · SAP ECC 6.0 Can anybody suggest/help how to fix this?
What is mySAP ERP. How is it different to SAP ERP.
what is the difference between the open items and cleared items with live example
What is an intermediate bank? : fi- general ledger master data
What is Realization Phase in SAP ?
What is web? What is its purpose?
Differentiate manual check deposit from electronic check deposit? : fi- general ledger
How the function code handles in flow logic?
Is it possible to change an existing b/s gl account to the p&l type? : fi- general ledger accounting
What is activity rate?
why field status maintain at ps level and gl level