what is the allowable silt content in concrete?
Answers were Sorted based on User's Feedback
Answer / imran
Varies for type and use of concrete, CPWD and IS both are having conflict in it, generally we take and/or accept 8% silt by Volume after 3 hours, and 3% by dry sieving (Passing from 75 micron IS sieve). for Infra projects it is restricted for 5%.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sahil
According IS-383. Silt content by volume is 8% and by weight 15%
Is This Answer Correct ? | 0 Yes | 0 No |
what is difference between GTS bench mark and temporary bench mark
Approximate size of the metal use for normal concrete?
What are the different methods for drawing an arc?
What is the difference between Fe 500, Fe 500 D and Fe 515.
In a beam tension is always at the bottom but sometimes when we design using staad we get more number of rebars at the top compression zone Why?
how much repeitation for conventional and maivan formwork?
how the centre of gravity is used in construction?
how to calculate reinforcment in staircase cranked beam?
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
How may kgs. of sand make one brass ?
how much difference we have to provide when column steel staggered
Which foundation is stronger, Pile or Standard?