Answer Posted / sahil
According IS-383. Silt content by volume is 8% and by weight 15%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
how much tempareture are required to make liquid state of pid leed
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How did the romans get water up hills using aqua ducts?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
PL.tell me about civil engineering questions with answer
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Define What is a projection line?
What is Architect-Prepared Contract?
In Rcc ratio calculation I wanted to know quantity of Steel also.
Volume of 25kg putty bag & 40 kg putty bag volume??
Which type of plywood & sizes using in construction projects ?