Answer Posted / imran
Varies for type and use of concrete, CPWD and IS both are having conflict in it, generally we take and/or accept 8% silt by Volume after 3 hours, and 3% by dry sieving (Passing from 75 micron IS sieve). for Infra projects it is restricted for 5%.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
List out some of the software program that can be useful for architect?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Difference between lime, distemper and plastic emulsion?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
explain the rale of the government in the construction industry
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
What are your goals?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
crank types
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What are the basic use of runners and standards of pipelines?
Explain what is Hybrid Foundation?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
I want to join bhel because