What are the contents of a Test Plan?
Answers were Sorted based on User's Feedback
Answer / nani
Test Plan document was prepared by Project manager/test
manager.
the contents of test plan are like below :
1)title
2)revision history
3)objective of the document
4)scope of document
5)objective of testing
6)brief description of the project
7)critical functionalities
8)functionalities not to be tested
9)test environment
10)test data with requirement and collections
11)training plan
12)test strategy
13)automation analysis
14)effort estimation
15)resource estimation
16)scheduling
17)input criteria
18)output criteria /exit criteria
19)acceptance criteria
20)test suspension criteria
21)test resumption criteria
22)test completion criteria
23)test deliverables
24)standards to be followed
25)risk analysis
26)bug tracking and bug clarification
27)report verification
please let me know if any mistake in it.
with regards
Nani
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / suneela
Activities at this stage are:
1:Items to be tested
2:Features to be tested
3:Types of testing to be performed
4:The personnel responsibility of the testing
5:Resources and schedule required to complete testing
6:Risks associated with the plan
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / ramprasad.s
Test Plan:
1. Test Scope
2. Resource List.
3. Build Schedule.
4. Testing Types.
5. Test Documents.
6. Test Deliverable s
7. Approvals.
| Is This Answer Correct ? | 1 Yes | 1 No |
Contents of the test plan are
1. Entrance and Exit criteria
2. Features to be tested and Features not to be tested
3. Environments
4. Resource and training
5. Reports like status, summary and defect tracking reports.
6. Risk analysis
7. Suspension criteria.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / somesh
Test Plan document was prepared by Project manager/test
manager.
the contents of test plan are like below :
1)title
2)revision history
3)objective of the document
4)scope of document
5)objective of testing
6)brief description of the project
7)critical functionalities
8)functionalities not to be tested
9)test environment
10)test data with requirement and collections
11)training plan
12)test strategy
13)automation analysis
14)effort estimation
15)resource estimation
16)scheduling
17)input criteria
18)output criteria /exit criteria
19)acceptance criteria
20)test suspension criteria
21)test resumption criteria
22)test completion criteria
23)test deliverables
24)standards to be followed
25)risk analysis
26)bug tracking and bug clarification
27)report verification
please let me know if any mistake in it.
with regards
Somesh
09167079522
| Is This Answer Correct ? | 0 Yes | 0 No |
What do you do if the bug that you found is not accepted by the developer and he is saying its not reproducible.
Hi Please tell me about ERP for hr module what all function u found in hr model .
How does u write test scenarios for Television /Refrigerator?
HI GUYS...I INFORM U ONE IMP MATTER PLS..... REMEMBER IT...IN AMEERPET OR HYD ..YOU NEVER GO TO TRAINING FOR ETL TESTING..BECAUSE ALL FACULTIES ARE FRAUDS.. ZERO KNOWLEDGE ON ETL TESTING...ESPESIALLY "INFOSHARE TECH", & "CTRL+A" ETC...
How could you handle the situation when you get the high seveority bug when the application is going to deliver by today night?
What is meant by code walkthrough?
I am sujili(frm chennai) new commer for this site? I have some doubt's pls clarify it..... I finished my B.Tech 2004 pased out(CSE),(sujli2000@yahoo.com) and S/w Testing Course(2007) Now iam serarching a job in Testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,for Banking,ERP Projects etc.
I am working in a small company as a QA analyst. Suppose company has a no testing work and they give me some other works like data entry work then how to reply in that matter. Means what I have to say? whether I have to accept the work or what? Please reply.
Have you prepared traceability matrix and how to prepare it?
what is meant by application server and its functions?
entry and exit criteria for each phase in STLC and SDLC
What is testing ?