Answer Posted / suneela
Activities at this stage are:
1:Items to be tested
2:Features to be tested
3:Types of testing to be performed
4:The personnel responsibility of the testing
5:Resources and schedule required to complete testing
6:Risks associated with the plan
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how will we change the server system time?
What type bugs you will find in integration testing with example?
what is mean by Performance Related Testing in data base?
What is bottom-up approach?
How do you scope out the size of the testing effort?
What are the possible test scenarios around AVS check of any credit card? (Testing through payment gateway online) (What are the fields we should check while checking AVS and CVV)
What knowledge I must have as a 3 yrs. manual tester??
How to integrate Bugzilla with QTP?
test cases on bangles???
what is diffrence between dynamic black box testing and dynamic white box testing
What and why is api testing?
how will the test plan is pepared in ur organisation>?
What is remedy testing,expalim that and how can use that
Can you do system testing at any stage of sdlc?
Hi, My name is Dinesh.I want to prepare for ISTQB certification , So can anyone please email me the syllabus of it and what is criteria for giving exam.Please email me answers at: dinesh0323@live.com