what"s the cement, sand, aggregate(consumption) quantity
for 10 cm thick roof slab (1:2:4)
Answer Posted / parminder singh
we consider the 10 cm thick slab and 1 m squre area
volume of slab = .1 cu m
wet concrete volume is same as volume of slab
for .1 cum wet concrete = 1.5 time required dry
material
therefore total dry volume require = 1.5* .1 = .15
volume of cement =.15/7 = 0.0214 cu m
bags = .614
volume of sand = 0.0214*2 = .0428 cu m
volume of course aggregate = .0856 cu m
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
Why do you want to work here
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
What are the materials used in building a gravity dam?
what is the ingredient value of 40mm and 20mm aggregates?
What do you mean by bond? What are the different types of bonds?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
what is pile and deam foundation
How you can use different dimension tools in cad? What are the different dimensions available?
what is the relation between pitch of steel and depth of slab?
what are the proper pipes for salt water line
natucher of concrete &type of concrete?
how to calculate the density for high density concrete ? or is it same as the density of RC?