what"s the cement, sand, aggregate(consumption) quantity
for 10 cm thick roof slab (1:2:4)

Answer Posted / pradeep tk

as volume-----
for 1 m3 concrete, volume=1m3
propotion=1:2:4

ie, volume of cement=1*1/7

=0.142 m3
volume of sand=2*1/7
=.285 m3
volume of aggregate=4*1/7
=0.571 m3

for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3

sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m3

Is This Answer Correct ?    11 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1558


Define What are the reasons for geotechnical site investigations in Uganda?

782


What are your goals?

2275


Differentiate orthographic and isometric projections?

736


What is alternate bid?

793






If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

2008


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

769


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2485


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9166


Which brick is best for construction ,either fly ash or AAC BLOCKS

663


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

1838


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1994


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

1508


Prepare a Schedule for a Highrised building from starting stage to Handover?

1606


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2359