What is the correct procedure to shutdown VCB in 11kv
substation.safety and work procedure

Answers were Sorted based on User's Feedback



What is the correct procedure to shutdown VCB in 11kv substation.safety and work procedure..

Answer / query

The correct procedure to Shut down VCB is to first trip the
VCB through Manual/electrical command . Then open the
Downstream(outgoing) isolator earth it for any trapped
charges. repaeat the same with the Upstream(Incoming)isolator.

Is This Answer Correct ?    14 Yes 2 No

What is the correct procedure to shutdown VCB in 11kv substation.safety and work procedure..

Answer / balaji

1. Preparation (Permit to work)
2. Separation (Trip the Breaker)
3. Isolation (Isolator isolates)
4. Earthing & Short circuit (Earthing)
5. Screening & Marking the area (Barricading the work area)

Is This Answer Correct ?    11 Yes 2 No

What is the correct procedure to shutdown VCB in 11kv substation.safety and work procedure..

Answer / manzoor hussain

1)First need to obtain isolation permit(work permit)
2)Confirm substation no., breaker no.
3)Inform to control engineer
4)Transfer the load from LV side
5)First need to trip the vcb(electrically or manually)
6)Disconnect DS switch (isolator)
7)Need to close the earth switch (ES)

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the purpose of supervision relay coil

1 Answers  


we touch other end of the tester supply, why do not get shock?

7 Answers   L&T,


What will hapen if we connect more capacitors than required for powerfactor control? Exactly what will be the effect on power system?

2 Answers   Mandovi Pellets,


What are the properties of a resistor?

0 Answers  


CT Ratio of a energy meter connection is Red Phase : 100/5A, yello Phase : 50/5A & Blue phase : 100/5 A what is the overall Multiplication factor

0 Answers  






how much load 15kva dg set can bear

7 Answers  


Generally at what power factor the electronic equipments like computer, TV, EPABX etc.,operates. Please tell me.

1 Answers   HAL,


How to check phase R,Y,B

3 Answers  


can u give me a brief idea about power line carrier communication ??

0 Answers  


If breaker is undefined position, first step to do.

0 Answers   KSEB, L&T, Siemens,


What is the use of Isolation Transformer, and Neutral is using for return path, finally this current is going.... but same time the voltage of the neutral should be below 1 V...

6 Answers  


what is diff. b/w of earth & neutral?. why we are separately using ?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)