What is the correct procedure to shutdown VCB in 11kv
substation.safety and work procedure
Answer Posted / manzoor hussain
1)First need to obtain isolation permit(work permit)
2)Confirm substation no., breaker no.
3)Inform to control engineer
4)Transfer the load from LV side
5)First need to trip the vcb(electrically or manually)
6)Disconnect DS switch (isolator)
7)Need to close the earth switch (ES)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is meant by motor startup supervision & motor load jam protection ?
What is CCM in Electrical ? where can we use this material?
Witch do depand of Power factor and theory of power factor?
what is the main difference between power devices and signal devices
please give me all the Alarm .Trip ,Safety Relays & Conditions of UPS Systems mail me on ashokbabunhce@gmail.com
Define norton equivalent circuit?
As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.
What descriptive information does the NEC require to be marked on all conductors?
why transformer ratings in kva? & DG ratings in kva? & Motor ratings in kw/HP?
Inductor and capacitor........power in one phase and ...... in it another phase.
The simple way of finding the leakage quantity and % in compressed air distribution system
How much dc volt applied in cathodic protection system?
how open delta PT works & what is its construction?
What is Auto Mains Failure Panel & Auto Synchronizing Panel
what r substations?what r there work?why voltages r incresed and then reduced during distribution of power