What is the correct procedure to shutdown VCB in 11kv
substation.safety and work procedure

Answer Posted / manzoor hussain

1)First need to obtain isolation permit(work permit)
2)Confirm substation no., breaker no.
3)Inform to control engineer
4)Transfer the load from LV side
5)First need to trip the vcb(electrically or manually)
6)Disconnect DS switch (isolator)
7)Need to close the earth switch (ES)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

anyone knows service engineer in chennai for EDM SPARKING MACHINE.CHMER PULSE CD 60 M.pL GIVE ANY CONTACT NOS

2053


state the disadvantages of carbon filament???

2473


What is the complete procedure of erection of electrical panel in industry

1475


what is the solution for meger test failed the MV cable?

3699


can i connect REF and Differencial relay in 1 CT core for transformer protection?

1558






ACCORDING TO IEC WHAT SHOULD BE THE MINIMUM HEIGHT OF G.I. STRUCTURE OF CT, PT, ISOLATOR, LA?

1694


i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.

1757


TELL ME WHAT IS INDUCTOR AND CAPACITOR WHAT IS IT BASIC OPERATION ANDFUNCTION?

1660


what is the necessary of using inductance property in transmission lines even through resistance is used to opposes the high current flows in that?????

1537


What Maximam Gap Taibaar & Bush

1919


what's the requirement of Dy11d0 connection of 3 phase transformer?what's use of it?

7543


i want to know that what is the eligibility critaria for ongc exam?

2663


1 Ton is equal to how many watts?

776


What are the disadvantages of autotransformer?

734


What is the type of feedback used in an op- amp schmitt trigger?

725