why is M30 grade Concrete use for Foothing & Column M50
No Answer is Posted For this Question
Be the First to Post Answer
How much will be Concrete required for one Sq.meter of area for building work?
2 Answers PSD, SMC, Tudor Infrastructures,
60-70 grade of Bitumen is VG-30 ?
how to convert kg/m3 to kg/cft
i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
how much quantity of tile placing can be finished by one mason per day?
what is the maximum number of course that can be laid according to IS code and the max height.
what is meant by camber
how much cement and sand required for 1cum rr masonry
what is the m20 grade concrete ingredients?
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
How Much span required for 1 sqm of shuttering(Beam & Slab)
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)