what is the least-count of plane-
table,dumpy,theodolite,compass,tachometer?
Answers were Sorted based on User's Feedback
Answer / akash verma illiterate enginee
dumpy levey: least count 5mm as it is based on staff
reading thats why least count is 5mm.
theodolite: least count is 20"
compass: least count is 30'
Is This Answer Correct ? | 751 Yes | 62 No |
Answer / shivkumar
dumpy levey: least count 5mm as it is based on staff
reading thats why least count is 5mm.
theodolite: least count is 20"
compass: least count is 30'
Is This Answer Correct ? | 257 Yes | 27 No |
Answer / sanjay kumar
least count of leveling staff is 5mm because there is no
measurement or level of any berm,concrete structure or any
other item in civil engineering line whose multiple is
other than 5.
Is This Answer Correct ? | 175 Yes | 18 No |
Answer / yogesh naik
height of building can be measure by ?
techeometer
Is This Answer Correct ? | 115 Yes | 12 No |
Answer / naveen kumar
Total station : Least count for total station for angle is 1° & Distance is 1mm
Is This Answer Correct ? | 87 Yes | 37 No |
Answer / nilay patidar
Theodolite least count is 20 to 30 secods
Is This Answer Correct ? | 58 Yes | 29 No |
Answer / juvva anitha
least count of dhumpy level is 5mm
least count of theodalite is 20''
and for prismatic compass is 30'
Is This Answer Correct ? | 26 Yes | 1 No |
Answer / pankaj yadav
least count of theodolite 20''
prismatic compass 30'
Is This Answer Correct ? | 27 Yes | 6 No |
Formula for calculating the volume of bulb in underreamed pile
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
What are the functions of a column in a building?
Discuss some applications of modular elasticity?
OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)
what is difference in chemical composition between fe415 and fe500
define curing? what is the necessity of curing?
to minimize budget cost of building , what can i do
What are the different theories of failure under static load?
Define What is Civil Engineering?
what is formwork in construction
List out some of the software used in the construction sector to estimate cost and monitoring expenses?