Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


do we need NGR panel when the output of the genset is LV
but after that it is step up to 22 kv. condition is 12
genset 400v are operating in parallel.



do we need NGR panel when the output of the genset is LV but after that it is step up to 22 kv. co..

Answer / mohammad farman khan-abu dhabi

yes, this is required

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

EXPLAIN METOD OF IMAGE OF TRANSMISSION LINE/ WHAT ARE ITS PRACTICAL APPLICATION?

0 Answers   Coal India,


What is relation between mu(nought) and epsilon(nought)?

0 Answers  


We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.

0 Answers  


what is the workimg of ct &pt?

5 Answers  


What are the specifications for conducting earth leakage test as per IEC standard?

0 Answers  


if the rotor of induction motor is purely inductive then what is the electromagnatic torque.........

1 Answers  


How to measure the capacity/rating of a distribution transformer in KVA?

0 Answers  


why the excitation is necessary to produce the reactive power

2 Answers  


why earthing is not required on transformer prymary winding side ???

13 Answers   Genpact,


what are the functions of power modulator?

4 Answers  


If I have a motor of 1 MW with 6.6 kV, running at 35% load, how can I save energy without reducing the load?

6 Answers   Reddy Labs,


Which standard i will refer for size of earthing conductor for equipment? (Eg:415V Switchgear, MCC, DB shall be 50x6mm GI flat)

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)