do we need NGR panel when the output of the genset is LV
but after that it is step up to 22 kv. condition is 12
genset 400v are operating in parallel.
Answer Posted / mohammad farman khan-abu dhabi
yes, this is required
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
What are different types of control systems?
what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)
what is parellel power factor correction?
does buccholz in a transformer use batteries
briefly explain principle of resistance welding
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
How to calculate the electrical load for a standard telecom BTS shelter and choose the DG set capacity for the same load?
what is maxemo work permit procedure
Percentage losses in power generation?
kVA rating of ordinary transformer is increased when connected as an auto transformer because A transformation ratio increased B secondary voltage increased C energy is transferred both inductively and conductively D secondary current increased
How line capacitance & line inductance varies with increase in height tower.
Can we use 230VAC, 63A MCB for 120VAC, 63A supplied heaters load?
how to calculate the fault in substation