I am facing error at the time of background
job(SAP_WP_CACHE_RELOAD_FULLStep 001 started (program
RWP_RUNTIME_CACHE_RELOAD, variant SAP&RELOAD_ALL, user ID DDIC)
No component system chosen
Job cancelled after system exception ERROR_MESSAGE
Step 001 started (program RWP_RUNTIME_CACHE_RELOAD, variant
SAP&RELOAD_ALL, user ID DDIC)
Message no. 00550
please help me with this
Answer / s.m.feroz ahmed
Hi,
One can cancel their own jobs with the help of command SMX.
Is This Answer Correct ? | 0 Yes | 3 No |
How to increase swap memory without doing any changes to Parameter value
What Is your landscape
what is ora-00252 and ora-00272 error represents how can u prevent this error?how can u trouble shhot this error?
How to calculate J2EE Ports?
What is enqueue time ?
If i want to increase Dialog WP in process what is the procedure to increase the Dialog WP?
The Users are not able to save the data, as a BASIS ADMIN me to not able to save, what is the problem would be..?
How can one start Sap Application Server through Command prompt and what is the command used to start SAP Application Server ?
What is the difference between a Transport Domain and a Transport group.
what is the difference between transport layer and consolidation root
What is the importance of the clients 000,001 and 006?
I have all the authorizations but still unable to do client export what may b the cause..............?