( mean sea level )for which activity we will use this statement?

Answers were Sorted based on User's Feedback



( mean sea level )for which activity we will use this statement?..

Answer / upenderreddy

in levelling we will use the reduced level of bench mark
which is point of level from mean sea level

Is This Answer Correct ?    8 Yes 3 No

( mean sea level )for which activity we will use this statement?..

Answer / abhimanyu

For determining the reduced level of any point on ground, we required a bench mark(point whose height from the mean sea level is specified). So, we use mean sea level for the levelling process.

Is This Answer Correct ?    0 Yes 0 No

( mean sea level )for which activity we will use this statement?..

Answer / beachboy

Distance from benchmark zero established relative to
surface of flat sea distance from centre of earth on an
internationally agreed reference date.

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

Please tell me present is code no for steel structure work. Thanks.

2 Answers  


what mean By core Billing

0 Answers  


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

0 Answers  


What is the difference between Autodesk revit structure and STAAD pro.? How much it is useful to structural engineer in modelling, analysis & design of RCC and Structural steel structures than STAAD pro.?

3 Answers   L&T,


what do you mean by ssd how it calculated

3 Answers  






Construction joint of beam & slab is provided at––

1 Answers   Construction,


for gravel roads in India to get 1feet height how much height we have to fill

0 Answers   Sunrise,


Why do we use steel in Column? Why HYSD bar is preferable than plain bar?

11 Answers   Enercon,


how material can be calculate for brick work in 1:6

3 Answers   L&T,


what are the challenges of being a team leader and a supervisor?

0 Answers  


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

0 Answers  


how to carry out rate analysis for RCC work in column using M20 ?

1 Answers   Mazna Building Contracting,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)