1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / sunil
One Mason with one helper 20-25 sqm plaster should be finished
| Is This Answer Correct ? | 14 Yes | 55 No |
Post New Answer View All Answers
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
Define the various stages of the project planning process in construction.
why we are useing plastic under the lean concrete?and whts the advantage?
Define What is the best type of wood glue?
what is the function of GSB all class ?
Define What is the origin of name Railway Sleepers?
Explain what are the problems one might face while having a Cantilever balcony?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
What is the meaning of soil reinforcement?
Time required for curing of wall tiles before fixing
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
how to caliculate required amount of cement and sand required for 1cu.m.
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,