Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


800a siemens vcb in our company can not be closed electrcally
an mechanicaly cc and oc coils are found ok. why?

Answers were Sorted based on User's Feedback



800a siemens vcb in our company can not be closed electrcally an mechanicaly cc and oc coils are f..

Answer / prakash gokhale

Please check for the mechanical assembly of the VCB. Some
times due to some misalighments breaker can not be closed
mechanical or electricaly even if CC & OC are ok.

Is This Answer Correct ?    3 Yes 1 No

800a siemens vcb in our company can not be closed electrcally an mechanicaly cc and oc coils are f..

Answer / harish kumar

please check the BREAKER FUTURE INTERLOCKS ( LOOPS) MISSING IN THE CIRCUITS.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

I WANT TO INSTALL LIGHTING ARRESTOR ABOVE 20 FEET HEIGHT INDUSTRIAL BUILDING. NOW IT WAS 15 FEET HEIGHT HOW MUCH DISTANCE IT WILL COVER & HOW TO CALCULAT THE DISTANCE COVER BY THE ARRESTOR

0 Answers  


How do u term the word 'OF' in Megger Testing???

2 Answers  


how can maintain the power factor and why and this is how do work tell us

0 Answers   Wipro,


what are the types of control systems to control the speed of the motor??

1 Answers  


what is the difference between earth and unearth cable?

1 Answers   Essar,


Weather power factor correction needed for synchronous motors?

1 Answers  


FLP zone Types and Details

1 Answers  


What is the formula to calculate the rating of power cable for three phase current.

0 Answers  


For DG or Transformer body earthing, is it necessary to terminate the earth bus to earth pit directly? If not terminated to earth pit directly in earth pit and connected to any common bus strip which ultimately connects to earth pit, what will be the pros and cons?

1 Answers  


Do you know the alignment of a motor?

8 Answers   Reliance,


what is Use of Stones/Gravel in electrical Switch Yard??

4 Answers   Sanghi,


Transmission through a short line depends on

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)