Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Hi All,

I am working as a Technical executive in a MNC company and
we have 1500KVA & 1250KVA T/F in our site, can you help me
that how many maintenance tests can be conducted and what
are the procedures included for the tests can you share
yours answers and also give any web address to get more
information on this

Answers were Sorted based on User's Feedback



Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / virendra joshi

Dear friend ,

Transformer is a heart of the electrical system & that is
the reason it required more care.

Daily :-

Check the Oil level in Conservator.
check for any leakage in transformer
Check for any abnormal sound
check for Colour of silica gel.
Check for any air in Bucholz realay , if found realease
with the air vent provided in the relay.

Yearly.

Check the Dielectrica strengh of oil , filter it & if
required replace it.

Check the earthing value of a Earthpit if required topup
with salt & water.

Check the tighness of the connection both the way Primaty
side & secondary side.

Clean the transformer yard throughly.

If required lay the granuals in the transformer yard.

By proper shut down manually check the tripping point of HT
breaker tripping set points like ( OT, WT & Bucholz Relay )

check the secondary side voltage as per desired voltage &
if any missallign found adjust with the tap changer.


please revert if any quarry exists.

Is This Answer Correct ?    3 Yes 0 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / tariq

in onload u cant do any test except temprature and sudden
pressur or oil level in conservator.oil leakage,cileco gel
colore for moisture,but in offload u can some more test
also.if u send ur question in detail may b i can help u

Is This Answer Correct ?    3 Yes 1 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / shivakumar.s

Which type of T/F ? Tell me first.

Is This Answer Correct ?    3 Yes 2 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / thyagarajan

checking of oil level in seal
reconditioning of silica gel
cleaning the bushing
check temp alarm
meger
check oil level in oltc, conservator

Is This Answer Correct ?    1 Yes 0 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / dr reddy's corporate offi

hai
1)take first permission from client & hod
2)switched off the brekers
3)rack out brekers applied loto kit
4)chek primary winding bushes & secondry winding bushes
5)chek silcazel colour(breather)
6)chek oil level & density of oil(resistance)
7)primary winding , secondary winding & core bolts retigtend
8)warnish apply winding
9)take break down votage test
10)chek oil teperature & winding temperaure guages functiong
11)chek oltc counter daily basis
12)trail tests taken buchloz realy

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In explosive and polluted environments which type of motors do we use?

3 Answers   NTPC,


motor is 12.5hp after starting few minets motot get hot? why?

5 Answers  


whis is the formula of converting KW into HP ?

14 Answers  


what is oti and wti

3 Answers   Jindal,


what is the chemical reaction of solt and charcoal in earthing?

1 Answers   Shyam Group,


what is the difference b/w neutral and ground?

4 Answers  


In VSD (variable speed drive)I/P and O/P connections given wrongly what will happen?

5 Answers  


WHAT ARE THE BELT HORMONICS IN AC MACHINE HOW TO REDUCE IT

2 Answers   DRDO,


Y phase plates are used in transmission line??? what is there need???

0 Answers  


Why do we use 36KV LAS for 33kv line and 9KV LAS for 11KV line?

1 Answers  


ASTM D 3455 - Standard Test Methods for Compatibility of Construction Material with Electrical Insulating Oil of Petroleum Origin has been used for Testing Transformer Oils with a product placed in it. Aged Control Oil has a Power Factor of 0.032% at 100°C. Aged Oil with a Test component has a Power Factor of 0.093% at 100°. Is this increase acceptable? If not why? How much increase is acceptable?

0 Answers  


what is d main difference between KVA and KWA

2 Answers   Charoen Pokphand,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)